Building Update – Spring 2015 (Photos)

The latest construction project at the Museum.  We removed the interior garage door, started the construction of the bathrooms.

 
This internal garage door was taken down and sold.

This internal garage door was taken down and sold.

 
Bill frames the first section of the bathroom wall.

Bill frames the first section of the bathroom wall.

 
Paul and Bill set up the core drill which will cut through six inches of concrete. All of the plumbing will go through the floor into the basement.

Paul and Bill set up the core drill which will cut through six inches of concrete. All of the plumbing will go through the floor into the basement.

Val and Doug are working on the window replacement project.